Southbridge Pump Station & Sewer

JCL was presented with a challenging project given the static water table at the time of commencement, the water table was at 1.5 meters and the wet well had an invert of over 5 metres in depth. The project involved considerable time spent de-watering and installing a specifically designed steel shield as sheet piling was not an option due to the gravel encountered. As testimony to the quality of work the pump has been operating without issue since completion of work.