Specialist Works
Bridle Path Trenching
CLIENT
McConnell Dowell, for Mobil NZ
LOCATION
Heathcote Valley, Christchurch
COMPLETED
2020
SCOPE
Rock-saw trenching for a fuel pipeline
Pipeline replaced
1,210 m
01 / Overview
Cutting through rock
beside a live fuel line.
02 / The work
Johnston Civil cut a new trench through hard volcanic rock up the Bridle Path for a replacement fuel pipeline, decades after helping install the original in 1980.
The fuel pipeline through Heathcote Valley was damaged in the Canterbury earthquakes and needed a permanent replacement. The work replaced 1,210 m of pipeline up Bridle Path Road, with the new line laid alongside the old one so it could stay in service.
Our rock saw chain trencher cut a clean, deep trench through blue and volcanic rock. Walking the machine up the steep, solid-rock slope was a challenge in itself, and our engineering team built a shorter, steeper conveyor to throw spoil clear of the trench.
The Bridle Path stayed open to walkers throughout, so the trencher was fitted with guards and fencing, spotters were posted, and work paused for families passing by. A tractor fitted with a long winch then pulled the new pipe up the trench.