Chain trencher cutting the pipeline trench up the Bridle Path, Heathcote Valley

Specialist Works

Bridle Path Trenching

CLIENT

McConnell Dowell, for Mobil NZ

LOCATION

Heathcote Valley, Christchurch

COMPLETED

2020

SCOPE

Rock-saw trenching for a fuel pipeline

Pipeline replaced

1,210 m

01 / Overview

Cutting through rock

beside a live fuel line.

02 / The work

Johnston Civil cut a new trench through hard volcanic rock up the Bridle Path for a replacement fuel pipeline, decades after helping install the original in 1980.

The fuel pipeline through Heathcote Valley was damaged in the Canterbury earthquakes and needed a permanent replacement. The work replaced 1,210 m of pipeline up Bridle Path Road, with the new line laid alongside the old one so it could stay in service.

Our rock saw chain trencher cut a clean, deep trench through blue and volcanic rock. Walking the machine up the steep, solid-rock slope was a challenge in itself, and our engineering team built a shorter, steeper conveyor to throw spoil clear of the trench.

The Bridle Path stayed open to walkers throughout, so the trencher was fitted with guards and fencing, spotters were posted, and work paused for families passing by. A tractor fitted with a long winch then pulled the new pipe up the trench.

Bridle Path Trenching
Bridle Path Trenching

1980 · the original pipeline

Bridle Path Trenching

1980 · the original pipeline

Bridle Path Trenching