Dredging, sheet piling and bank reshaping

Silt removed

30,000 t

01 / Overview

Dredging, piling

and reshaping the banks.

02 / The work

Stages 3 and 4A removed 30,000 tonnes of contaminated silt and reshaped the riverbanks, reaching practical completion in December 2020.

Citycare engaged Johnston Civil for the next stages of the Heathcote River works, part of Christchurch City Council's Land Drainage Recovery Programme. The aim was to improve stormwater flow through the Woolston catchment while stabilising and beautifying the riverbanks.

COVID-19 paused the work, which restarted in June 2020. Three teams worked in sequence: the amphibious excavator and barge removed the silt, and a GPS-controlled long-reach excavator reshaped and stabilised the banks behind it.

To build gabion basket walls for a new road, the team drove 8 m sheet piles into the river to form a coffer dam. A haul road along the river edge carried loaded trucks, and pumps ran around the clock while the surrounding environment was protected.

Heathcote River Stage 3 & 4A
Heathcote River Stage 3 & 4A
Heathcote River Stage 3 & 4A

03 / Gallery

GOT A PROJECT
IN MIND?
LET’S TALK.

GOT A PROJECT
IN MIND?
LET’S TALK.

GOT A PROJECT
IN MIND?
LET’S TALK.