Kainga Pressure Sewer

Site Works

Kainga Pressure Sewer

CLIENT

Empire Place Developments

LOCATION

Kainga, Christchurch

COMPLETED

July 2021

SCOPE

Pressure sewer main and rail crossing

Pressure main

850 m

01 / Overview

A new sewer main

under road and rail.

02 / The work

850 m of pressure sewer for the Waimakariri Business Park, including a crossing thrust beneath the KiwiRail line, completed in July 2021.

Empire Place Developments needed a new pressure main from its Waimakariri Business Park development to the existing sewer on Kainga Road. Johnston Civil trenched and installed 850 m of pressure sewer, plus a new manhole on the existing network.

A 300 mm carrier sleeve had to be thrust beneath the KiwiRail tracks across Kainga Road. Existing services blocked the planned route, so after exploratory work we developed a new design on the opposite side of the carriageway.

The team managed dewatering, running sand and COVID-19 supply delays and still finished on time. Before starting on Kainga Road, we met the neighbours and local businesses with a letter explaining the work, as it crossed their driveways.

Kainga Pressure Sewer
Kainga Pressure Sewer
Kainga Pressure Sewer