Site Works
Kainga Pressure Sewer
CLIENT
Empire Place Developments
LOCATION
Kainga, Christchurch
COMPLETED
July 2021
SCOPE
Pressure sewer main and rail crossing
Pressure main
850 m
01 / Overview
A new sewer main
under road and rail.
02 / The work
850 m of pressure sewer for the Waimakariri Business Park, including a crossing thrust beneath the KiwiRail line, completed in July 2021.
Empire Place Developments needed a new pressure main from its Waimakariri Business Park development to the existing sewer on Kainga Road. Johnston Civil trenched and installed 850 m of pressure sewer, plus a new manhole on the existing network.
A 300 mm carrier sleeve had to be thrust beneath the KiwiRail tracks across Kainga Road. Existing services blocked the planned route, so after exploratory work we developed a new design on the opposite side of the carriageway.
The team managed dewatering, running sand and COVID-19 supply delays and still finished on time. Before starting on Kainga Road, we met the neighbours and local businesses with a letter explaining the work, as it crossed their driveways.