Site Works
Kainga First Flush Basin
CLIENT
Empire Place Developments
LOCATION
Kainga, Christchurch
COMPLETED
May 2021
SCOPE
Stormwater basin, swale and culverts
Basin excavation
16,800 m³
01 / Overview
Holding back stormwater
for a new business park.
02 / The work
A first flush stormwater basin on Environment Canterbury land at Kainga, built for Empire Place Developments and completed in May 2021.
With the sewer upgrade for the Waimakariri Business Park crossing Environment Canterbury land, the opportunity was taken to build a stormwater basin to help with overland flooding. ECan and Empire Place Developments shared the cost.
The work included 16,800 m³ of basin excavation, 24,000 m² of shaping and stabilisation, drain regrading, a new swale, culverts and headwalls, a 350 m ballast low-flow channel and a concrete weir outlet.
Early on, the ground conditions and high water table showed the original design couldn't be built. Johnston Civil and Davie Lovell-Smith revised it to suit the flat grades, saving the client money, and the basin was finished by the programmed May 2021 date despite finding asbestos.