A worker guides the new pump station tank into its pit at Hōhepa, Halswell

Site Works

Hōhepa Wastewater Upgrade

CLIENT

Hōhepa Canterbury

LOCATION

Halswell, Christchurch

COMPLETED

May 2025

SCOPE

Pump station and 1 km rising main

Rising main

1 km

01 / Overview

Connecting Hōhepa

to the city network.

02 / The work

A new pump station and 1 km rising main replaced Hōhepa's on-site wastewater disposal, delivered in eight weeks with no safety incidents.

Johnston Civil was the main contractor for the Hōhepa Wastewater Upgrade in Halswell, working with consulting engineers EGIS and directional drilling specialists Utilities NZ. The project replaced an on-site irrigation system, whose consent had expired, with a connection to the public wastewater network.

The site sits beside the Halswell River, over a confined aquifer, with a high water table. The pump station was installed inside a 4 m by 4 m box shield with dewatering and settlement tanks, and the existing system stayed live until the final connection.

The rising main crossed farmland, council land and the Halswell River before connecting at Sabys Road, on the boundary of Selwyn District and Christchurch City. Directional drilling reduced open trenching near powerlines, and the work finished on time and under budget.

Hōhepa Wastewater Upgrade
Hōhepa Wastewater Upgrade
Hōhepa Wastewater Upgrade

03 / Gallery

GOT A PROJECT
IN MIND?
LET’S TALK.

GOT A PROJECT
IN MIND?
LET’S TALK.

GOT A PROJECT
IN MIND?
LET’S TALK.