Specialist Works
Imerys Pond Cleaning
CLIENT
Imerys
LOCATION
Kerikeri, Northland
COMPLETED
March 2025
SCOPE
About 10,000 m³ pond clean-out
Material removed
10,000 m³
01 / Overview
Restoring capacity
at a working plant.
02 / The work
Johnston Civil took its amphibious excavator to Northland to clear about 10,000 m³ of ceramic material from a holding pond at Imerys' Kerikeri site, finishing in March 2025.
Imerys, a French multinational in industrial minerals, runs a ceramics operation near Kerikeri. Its holding pond catches runoff from the processing plant before treatment and discharge, and it was close to full.
The pond base was saturated and unstable, so conventional tracked excavators risked sinking. Our amphibious excavator travelled from the South Island with a long-reach excavator and support units, and was reassembled on site with an 80-tonne crane.
Imerys' head office in France approved the lift plan before work began, and the job was scheduled for summer to avoid higher rainfall. The pond was restored to full capacity within budget and programme, keeping clay processing running.



03 / Gallery