Council Work
Leeston-Doyleston Cycleway
CLIENT
Selwyn District Council
LOCATION
Leeston to Doyleston, Selwyn
COMPLETED
October 2020
SCOPE
2.1 km shared path, culverts and drainage
Path
2.1 km
01 / Overview
Joining two towns
with a safe path.
02 / The work
A 2.1 km walking and cycling path between Leeston and Doyleston for Selwyn District Council, completed in October 2020 and opened to the community that November.
Johnston Civil won the Leeston to Doyleston Cycleway through a competitive tender, then negotiated the third portion that joined the two ends. The path runs beside busy Leeston Road between Manse Road, Leeston and Drain Road, Doyleston.
Alongside the path, the council wanted better entrances and improved stormwater drainage between the towns. The work included a large box culvert installed into a live waterway and 937 m of post and rail fencing beside neighbouring farms.
Drawing on local knowledge of the ground, we proposed a new design for the concrete block retaining wall, saving the council time and cost. Traffic on Leeston Road was managed throughout, and the finished path was well received at its opening.

Drone flyover