Aerial view of the Milns Road subdivision earthworks beside Sparks Road, Halswell

Land Development

Milns Road, Stages 1 & 2

CLIENT

Carter Group

LOCATION

Halswell, Christchurch

COMPLETED

July 2025

SCOPE

Civil works for 54 lots

Residential lots

54

01 / Overview

Turning low-lying land

into serviced sites.

02 / The work

Stages 1 and 2 reached practical completion in July 2025, providing civil infrastructure for 54 residential lots and a new shared-path connection along Sparks Road.

Johnston Civil delivered the civil works for Stages 1 and 2 of the residential development at 179 Milns Road in Halswell. The work covered 54 lots and brought together earthworks, roads, water, wastewater, stormwater, power and fibre infrastructure.

The site sat between Milns Stream, Connals Drain and busy Sparks Road. Low-lying ground, a high water table and live traffic made construction sequencing and environmental controls central to the job.

The scope included raising and forming the development site, constructing roads and footpaths, installing services, and realigning Connals Drain. Along Sparks Road, a 300 m shared path was delivered beside the naturalised drain, rock-wall features and planting.

Excavator loading an articulated dump truck at Milns Road, Halswell

Drone flyover

Site plan of Milns Road, Stages 1 & 2, showing the lots between Milns Road and Sparks Road

Site plan · Stages 1 & 2 (supplied drawing)

Site plan of Milns Road, Stages 1 & 2, showing the lots between Milns Road and Sparks Road

Site plan · Stages 1 & 2 (supplied drawing)

Rock-lined drainage channel at Milns Road at dusk

03 / Gallery

GOT A PROJECT
IN MIND?
LET’S TALK.

GOT A PROJECT
IN MIND?
LET’S TALK.

GOT A PROJECT
IN MIND?
LET’S TALK.