Milns Road, Stages 1 & 2
CLIENT
Carter Group
LOCATION
Halswell, Christchurch
COMPLETED
July 2025
SCOPE
Civil works for 54 lots
Residential lots
54
01 / Overview
Turning low-lying land
into serviced sites.
02 / The work
Stages 1 and 2 reached practical completion in July 2025, providing civil infrastructure for 54 residential lots and a new shared-path connection along Sparks Road.
Johnston Civil delivered the civil works for Stages 1 and 2 of the residential development at 179 Milns Road in Halswell. The work covered 54 lots and brought together earthworks, roads, water, wastewater, stormwater, power and fibre infrastructure.
The site sat between Milns Stream, Connals Drain and busy Sparks Road. Low-lying ground, a high water table and live traffic made construction sequencing and environmental controls central to the job.
The scope included raising and forming the development site, constructing roads and footpaths, installing services, and realigning Connals Drain. Along Sparks Road, a 300 m shared path was delivered beside the naturalised drain, rock-wall features and planting.

Drone flyover