Bulldozer and roller on the earthworks at Quail Rise, Stage 3, in Stoke, Nelson

Land Development

Quail Rise, Stage 3

CLIENT

Solitaire Investments

LOCATION

Marsden Valley, Stoke, Nelson

COMPLETED

October 2024

SCOPE

10-lot hillside subdivision

Earthworks

50,000 m³

01 / Overview

Building platforms

on a Nelson hillside.

02 / The work

A 10-lot subdivision above Stoke and Tasman Bay, built from September 2023 to October 2024 and Johnston Civil's first large project outside Canterbury.

Johnston Civil delivered Stage 3 of Quail Rise in Marsden Valley for Solitaire Investments. The work included about 50,000 m³ of earthworks on steep, confined terrain, two large shear keys, a mechanically stabilised earth wall and civil works for all ten lots.

The shear keys and the 3,000 m³ MSE wall, built with geocell and geotextile, were designed for a magnitude 9 earthquake under geotechnical supervision from Tonkin + Taylor. Everything was built from the top of the site, with access tracks benched into the slope and small excavators lifted into the shear keys.

The Port Hills gravels are extremely stiff and had to be ripped with a 38-tonne excavator or a D8 dozer. Nine 3 m wide stormwater tanks with slow release were installed, and a strict erosion and sediment control plan protected neighbours and wildlife.

Quail Rise, Stage 3
Quail Rise, Stage 3
Quail Rise, Stage 3