Services / Council Work
BUILT AROUND THE PUBLIC.
Roads, paths, drainage and utilities for councils and their main contractors, built around traffic, neighbours and live services.
Roading & Public Paths
Drainage & Utilities

01 / Roading & public paths
ROADS AND PATHS IN LIVE CORRIDORS.
We build roads, footpaths and shared paths, with the kerb and channel, culverts and drainage that go with them. Most of this work sits beside traffic and neighbours, so traffic management, access and a tidy finish are planned from the start.
For Selwyn District Council we built the 2.1 km Leeston to Doyleston shared path, including a large box culvert placed into a live waterway. We proposed a new design for the concrete block retaining wall that saved the council time and cost. In Leeston we also upgraded Manse Road, installing three 4 m by 2 m box culverts for new vehicle crossings along with kerb and channel, footpath, water main and seal widening.
After the Kaikōura earthquake, working under Fulton Hogan for NCTIR, our crews repaired roads, drainage and retaining walls between Springs Junction and Nelson and on State Highway 1.
Includes
Road construction and seal widening
Footpaths, shared paths and cycleways
Kerb and channel, and vehicle crossings
Box culverts, headwalls and roadside drainage
Intersection and frontage upgrades
Retaining walls, including gabion baskets


02 / The process
HOW WE WORK ON PUBLIC SITES.
Step 01
UNDERSTAND
THE SITE
Review scope, available plans, existing services, access, ground conditions and relevant consent requirements before confirming the construction approach.
Step 02
METHOD AND
STAGING
Coordinate sequence, site controls and interfaces with the client, engineer and specialist contractors, and raise proposed design changes for approval. Every site gets a site-specific safety plan, and each task its own job safety analysis, before work starts.
Step 03
MANAGE LIVE
ENVIRONMENT
Coordinate work around roads, neighbouring properties, operating services and site users, keeping affected people informed. We write to neighbours and businesses before work reaches their driveways, and work at night when the network needs it.
Step 04
CHECK AND COMPLETE
Carry out the required inspections and testing, complete connections and reinstatement, and check the work against project requirements. Our surveyors record the as-builts for the engineer.


