Services / Site Works

READY TO BUILD ON.

Earthworks, building platforms, drainage, services, concrete and car parks for commercial, industrial and residential sites across Canterbury.

New concrete yard slabs being laid at Sims Metals Stage 3, from above
Sims Metals Stage 3 · Yard slabs in progress
New concrete yard slabs being laid at Sims Metals Stage 3, from above
Sims Metals Stage 3 · Yard slabs in progress
New concrete yard slabs being laid at Sims Metals Stage 3, from above
Sims Metals Stage 3 · Yard slabs in progress

01 / How we deliver

GROUNDWORK FOR THE BUILD.

We prepare sites for the builders who follow: bulk earthworks and building platforms, underground drainage and services, then concrete, kerbs and car parks.

Our scrapers, graders and dozers run 3D GPS for accurate levels, and our own surveyors set out the work and record the as-builts. On tight sites we share access with other trades. At the Kilmore Street rental car precinct, with several trades competing for space, the work still finished on time and to budget.

In central Christchurch we sheet piled the street edges of 54 Manchester Street and the Kilmore Street precinct, excavated to 2 m, then rebuilt each site to floor level in layers wrapped in filter cloth and geogrid.

At Sims Metals Stage 3 we’re sealing a whole compound in concrete, with new stormwater pipes, manholes and tanks. So far that’s more than 4,000 m² excavated and 1,080 m³ of concrete poured. Our commercial work has also included a Riccarton retirement village, in 2021 the largest contract Johnston had won, and a cinema at Wigram.

02 / What we deliver

FROM BULK DIG TO HARDSTAND.

Excavator digging the Kainga stormwater basin, with a GPS rover in the foreground
The Sims Metals yard during Stage 3 works, from above

Bulk earthworks and building platforms

Foundation preparation

Sheet piling and excavation on tight city sites

Underground stormwater, wastewater and water services

Stormwater basins and tanks

Concrete slabs and hardstand

Car parks, kerb and channel, and footpaths

Demolition and site clearance

Construction survey set-out and as-builts

1,080

Cubic metres of concrete poured so far, Sims Metals Stage 3

4,000

Square metres excavated so far, Sims Metals Stage 3

16,800

Cubic metres excavated for the Kainga stormwater basin

8

Weeks to build Hōhepa’s pump station and rising main