Services / Site Works
READY TO BUILD ON.
Earthworks, building platforms, drainage, services, concrete and car parks for commercial, industrial and residential sites across Canterbury.
01 / How we deliver
GROUNDWORK FOR THE BUILD.
We prepare sites for the builders who follow: bulk earthworks and building platforms, underground drainage and services, then concrete, kerbs and car parks.
Our scrapers, graders and dozers run 3D GPS for accurate levels, and our own surveyors set out the work and record the as-builts. On tight sites we share access with other trades. At the Kilmore Street rental car precinct, with several trades competing for space, the work still finished on time and to budget.
In central Christchurch we sheet piled the street edges of 54 Manchester Street and the Kilmore Street precinct, excavated to 2 m, then rebuilt each site to floor level in layers wrapped in filter cloth and geogrid.
At Sims Metals Stage 3 we’re sealing a whole compound in concrete, with new stormwater pipes, manholes and tanks. So far that’s more than 4,000 m² excavated and 1,080 m³ of concrete poured. Our commercial work has also included a Riccarton retirement village, in 2021 the largest contract Johnston had won, and a cinema at Wigram.
02 / What we deliver
FROM BULK DIG TO HARDSTAND.


Bulk earthworks and building platforms
Foundation preparation
Sheet piling and excavation on tight city sites
Underground stormwater, wastewater and water services
Stormwater basins and tanks
Concrete slabs and hardstand
Car parks, kerb and channel, and footpaths
Demolition and site clearance
Construction survey set-out and as-builts
1,080
Cubic metres of concrete poured so far, Sims Metals Stage 3
4,000
Square metres excavated so far, Sims Metals Stage 3
16,800
Cubic metres excavated for the Kainga stormwater basin
8
Weeks to build Hōhepa’s pump station and rising main